How long does a bathroom remodel take?
⌄
A full bathroom renovation usually runs two to three weeks. Much of that is waiting: the waterproofing, the tile setting and the grout each need time to cure before the next step, and rushing them is how new showers end up leaking.
Can we live here during it?
⌄
Yes, if there is another bathroom in the house. If this is the only one, there will be days without a shower. Say so at the walkthrough and the work is phased to keep those days as few as possible.
What drives bathroom remodel costs up the fastest?
⌄
Moving fixtures, and whatever turns up under the floor. A toilet or shower in a new place needs new drains through the joists. A rotted subfloor or a cracked cast iron drain found at demolition adds its own line. After those, tile to the ceiling, a frameless glass door and a custom vanity are the choices that add the most.
Can I save money by keeping the same layout?
⌄
Yes. When the toilet, sink and tub or shower stay where they are, the drains and supply lines stay too, and the job is new finishes and fixtures in the old places. That is the least expensive full bathroom remodel there is. The saving is biggest on a slab or in a basement, where moving a drain means cutting concrete.
Can I use my bathroom at all during the remodel?
⌄
Not for most of it. From demolition until the toilet and vanity go back in, the room is a work site with the water off to its fixtures. The shower stays off limits until the grout and sealant have cured. If it is the only bathroom in the house, tell us at the walkthrough and the work is phased to keep the days without one as few as possible.
How do you remodel a bathroom, step by step?
⌄
In this order: demolition to the studs and subfloor, then any subfloor or drain repairs, then rough plumbing and electrical with their inspections. Next come the backer board, the waterproofing membrane and a flood test of the shower pan, then tile, grout and cure time. The vanity, toilet, trim, glass, fan and lights go in last, followed by paint and caulk. The cure times between waterproofing, tile and grout take up much of the two to three weeks.
Do I need a permit to remodel a bathroom in Prince George's County?
⌄
If plumbing moves, wiring is added or a wall changes, yes. The building and electrical permits come from the county's Department of Permitting, Inspections and Enforcement in Largo, and WSSC Water issues the plumbing permit. Replacing tile and fixtures where they stand may need less, and DPIE decides. Some towns inside the county want their own sign-off too, so we check the address before the scope is written.
How long does tile work take to cure before the shower can be used?
⌄
Usually about three days after grouting with a standard cement grout, but the maker of the grout and setting material sets the time and we follow the label. Some fast-setting and epoxy products are ready sooner. The waterproofing membrane has its own cure time before any tile goes on, and the silicone at the corners and the glass needs a day before it gets wet. Using a shower early is how a new one gets its first cracked grout line.
Tub to shower conversion vs keeping a tub, which is better?
⌄
Convert when nobody takes baths and stepping over the tub wall is getting harder. Keep the tub when it is the only one in the house and there are young children, or you expect to sell to a family, because a house without a tub is a harder sell to them. With two full bathrooms, converting one and keeping the other covers both.
Should I reglaze my old tub or replace it?
⌄
Reglaze it if the tub is sound, you like it, and only the surface has worn: thin enamel, stains or a dated color. A cast iron tub in particular is worth keeping. Replace it if it is chipped through, leaks at the drain or overflow, or the wall tile around it is failing, because new tile means opening that wall anyway. Reglazing is a coating, so it wears faster than the original enamel and wants gentle cleaners.
Tile vs fiberglass shower surround, which lasts longer?
⌄
Tile over a proper waterproofing membrane, as long as the membrane is really there. Fiberglass and acrylic one-piece surrounds have no grout lines and go in fast, but they flex, scratch and crack over the years, and a cracked one gets replaced, not repaired. Tile on cement board with no membrane behind it can fail sooner than either, so the question to ask any remodeler is what goes behind the tile.
How do remodelers handle water damage found behind the shower?
⌄
By opening the wall until the wood is sound, showing you, and pricing the repair in writing before doing it. Wet or rotted studs, sheathing and subfloor around a leaking shower are common. The damaged wood is cut out and replaced, and the cause is fixed, usually a failed pan, missing waterproofing or a leaking valve, so the new shower does not repeat it. Any mold on the framing is dealt with before the wall is closed.
Why does my bathroom remodel quote keep changing?
⌄
Usually because the scope underneath it keeps changing, or the first quote was never built on one. A price given before anyone checked the floor and the stack, or before the tile and fixtures were chosen, will move. Ask for a written scope with every allowance named, tile at a stated price per square foot for example, and what the quote assumes about the subfloor. Then you can see which numbers are firm and why any one changed.
What causes bathroom remodels to fall behind schedule?
⌄
Waiting, far more than the work. A vanity, valve or shower door ordered late. Tile chosen after demolition. A subfloor repair nobody planned for, or an inspection that has to be rebooked. Glass is measured after the tile is set and then made, so it always adds days near the end. Ordering everything before demolition and checking the floor at the walkthrough removes most of that risk.
Can a bathroom remodel fix low water pressure or slow drains?
⌄
Sometimes. If the cause is inside the bathroom, such as galvanized supply lines closed up with scale or a sagging, corroded drain under the floor, the remodel is the right time to replace them, with a licensed plumber doing it under the permit while the walls and floor are open. If the whole house has low pressure, the cause is upstream at the main, the meter or the pressure regulator, and a bathroom remodel will not fix it.
What warranty should a bathroom remodel come with?
⌄
Our work on it is covered for 60 to 90 days, and the written scope names the term for your job. Fixtures, valves, tile and the waterproofing system carry their makers' own warranties, separate from ours, so keep the product names and receipts. Whatever you are offered, get the term in writing and know who to call.
How do I know a remodeler will waterproof the shower correctly?
⌄
Ask before you sign which waterproofing system goes behind the tile and whether the shower pan is flood-tested before any tile is set. Cement board alone is not waterproofing. A sheet or liquid membrane is. Ask to see the flood test, or a photo of it, because once the tile is on nobody sees it again. Every shower we build gets a membrane and a flood test before tile.
Can I find a bathroom remodeler in Hyattsville who handles everything, plumbing and tile too?
⌄
Yes. We remodel bathrooms in Hyattsville and the rest of Prince George's County under one contract and one project manager. Tile, carpentry and finishes are ours, the plumbing is done by a licensed plumber under the permit, and we book both in the right order so you are not coordinating trades. Older houses there often still have original drains, so the walkthrough checks the floor and the stack before the price.
My only bathroom has a leaking shower, how fast can a remodel start?
⌄
Stop using the shower first, and if water is coming through a ceiling, turn off the shower supply or the main shutoff valve. We do not offer emergency service. We are open 7:00 AM to 7:00 PM every day, a next-day walkthrough can be booked when it does not clash with another appointment, and a form sent after hours is answered during business hours. The start date then depends on the scope and any permit, and the work is phased to keep your days without a shower as few as possible.
Can a bathroom remodel be rushed if family is visiting soon?
⌄
Materials can be ordered early, but the cure times cannot be rushed. Waterproofing, thinset and grout each need their time, and a shower used too soon is the one that leaks later. If the visit date is fixed, tell us at the walkthrough. Sometimes the better plan is to start after the visit, or to have the toilet and sink working before the shower is finished.