Skip to main content
A commercial interior being fitted out with metal stud partitions, exposed ductwork overhead and workers on ladders down the length of the space
5.0 on Google · 4 reviews

Interior Demolition Before a Remodel in MD, DC and Northern VA

We gut kitchens, bathrooms, basements and commercial suites ahead of the remodel. The house or the building stays standing; only what the plan says comes out, and structure and utilities are marked for the next trade.

Gutting rooms ahead of a remodel

Interior demolition is the first stage of a remodel: the room is taken back to the studs, the joists or the slab so the new work goes onto something sound. We remove partitions, ceilings, flooring, millwork, fixtures and finishes, make utilities safe first, control the dust, haul the debris and sweep the space for the next trade.

  • Kitchen, Bathroom and Basement Gut-Outs
  • Selective Partition and Ceiling Removal
  • Flooring and Tile Removal
  • Millwork, Casework and Fixture Removal
  • Commercial Strip-Outs to the Shell
  • Debris Hauling and Disposal

Room Gut-Outs Before a Remodel

A kitchen, a bathroom or a whole floor cleared before the remodel, by the same crew that builds it back.

Partitions and Ceilings

Non-structural walls and ceiling systems taken out to the plan, with anything load-bearing identified before a single cut.

Flooring and Tile

Carpet, vinyl, tile and adhesive up, down to a substrate the next floor can go on.

Millwork and Fixtures

Casework, counters, shelving and fixtures removed, and anything you want kept set aside rather than broken.

Strip-Outs to the Shell

Everything back to the slab, deck and demising walls, ready for a new fit-out.

Hauling and Disposal

Containers, hauling and disposal included in the price, with the space swept and ready to hand over.

Demolition worries

You are worried someone cuts into a live line or a bearing wall.

Structure, live utilities and anything you want kept are identified and marked before the first cut. Anything bearing a load is handled first.

You are worried the dust gets into the rest of the building.

Dust walls go up between the work and the rest of the building, and the loud work is scheduled for when the building is empty. Access, loading and hours are agreed with you or the property manager.

You are worried you will be left with a pile of debris.

Containers, hauling and disposal are in the price, and the space is swept and handed over ready for the next trade.

Demolition Sets the Whole Schedule

Demolition is the first trade in, so its date moves every date after it. If the new space has to be finished before the mid November rush or ready for a busy season, clear it early. The crew that clears it can build it back. See tenant fit outs.

Demolition walkthroughs any day

Get the strip out priced

  • Free walk of the space to mark what stays
  • Hauling and disposal included in the figure
  • Utilities located before the first cut, in the scope

Space to clear? Call:

(240) 695-4415

Interior Demolition Request

We take insurance jobs. Financing may also be available for qualifying projects. Ask when you call.

How the strip out runs

  1. 1Structure, live utilities and anything you want kept are identified and marked before the first cut.
  2. 2Dust walls go up and the building's access, loading and hours are agreed with you or the property manager.
  3. 3Finishes, fixtures and millwork come out first, then partitions and ceilings to the plan.
  4. 4Flooring and adhesive are removed to a substrate the next floor can go on.
  5. 5Debris is hauled and disposed of, and the space is swept and handed over ready for the next trade.

Interior demolition questions

Do you do knock-down rebuilds in Maryland?

⌄
No. We do not tear a house down and build a new one on the lot. Our demolition happens inside the house: we gut the rooms you are changing to the studs, keep the structure, and remodel them. If the house is too small, we build an addition onto it. If every room needs work, that is a whole-home remodel, run by one project manager from the first day of demolition to the last bead of caulk.

How do you know what is safe to take out?

⌄
Structure and utilities are identified before the work starts. Live wiring, plumbing and anything bearing a load are marked and handled first.

What about the dust and the noise?

⌄
Dust walls between the work and the rest of the building, and the loud work scheduled for when the building is empty.

Can you demolish and then do the build-out?

⌄
Yes, and it is the better way to run it. The crew that clears the space knows exactly what is behind every wall when it is time to build.

Is hauling and disposal included?

⌄
Yes. Containers, hauling and disposal are in the price, and the space is swept before we hand it over.
Bonded & insured60 to 90 day warranty on our workSince 2020How every project runs →