Interior Demolition Before a Remodel in MD, DC and Northern VA
We gut kitchens, bathrooms, basements and commercial suites ahead of the remodel. The house or the building stays standing; only what the plan says comes out, and structure and utilities are marked for the next trade.
Gutting rooms ahead of a remodel
Interior demolition is the first stage of a remodel: the room is taken back to the studs, the joists or the slab so the new work goes onto something sound. We remove partitions, ceilings, flooring, millwork, fixtures and finishes, make utilities safe first, control the dust, haul the debris and sweep the space for the next trade.
- Kitchen, Bathroom and Basement Gut-Outs
- Selective Partition and Ceiling Removal
- Flooring and Tile Removal
- Millwork, Casework and Fixture Removal
- Commercial Strip-Outs to the Shell
- Debris Hauling and Disposal
Room Gut-Outs Before a Remodel
A kitchen, a bathroom or a whole floor cleared before the remodel, by the same crew that builds it back.
Partitions and Ceilings
Non-structural walls and ceiling systems taken out to the plan, with anything load-bearing identified before a single cut.
Flooring and Tile
Carpet, vinyl, tile and adhesive up, down to a substrate the next floor can go on.
Millwork and Fixtures
Casework, counters, shelving and fixtures removed, and anything you want kept set aside rather than broken.
Strip-Outs to the Shell
Everything back to the slab, deck and demising walls, ready for a new fit-out.
Hauling and Disposal
Containers, hauling and disposal included in the price, with the space swept and ready to hand over.
Demolition worries
You are worried someone cuts into a live line or a bearing wall.
Structure, live utilities and anything you want kept are identified and marked before the first cut. Anything bearing a load is handled first.
You are worried the dust gets into the rest of the building.
Dust walls go up between the work and the rest of the building, and the loud work is scheduled for when the building is empty. Access, loading and hours are agreed with you or the property manager.
You are worried you will be left with a pile of debris.
Containers, hauling and disposal are in the price, and the space is swept and handed over ready for the next trade.
Demolition Sets the Whole Schedule
Demolition is the first trade in, so its date moves every date after it. If the new space has to be finished before the mid November rush or ready for a busy season, clear it early. The crew that clears it can build it back. See tenant fit outs.
Get the strip out priced
- Free walk of the space to mark what stays
- Hauling and disposal included in the figure
- Utilities located before the first cut, in the scope
Space to clear? Call:
(240) 695-4415Interior Demolition Request
We take insurance jobs. Financing may also be available for qualifying projects. Ask when you call.
How the strip out runs
- 1Structure, live utilities and anything you want kept are identified and marked before the first cut.
- 2Dust walls go up and the building's access, loading and hours are agreed with you or the property manager.
- 3Finishes, fixtures and millwork come out first, then partitions and ceilings to the plan.
- 4Flooring and adhesive are removed to a substrate the next floor can go on.
- 5Debris is hauled and disposed of, and the space is swept and handed over ready for the next trade.