Skip to main content
An All Purpose Remodelers carpenter fitting countertop over new cabinets in a kitchen mid-renovation, with the floor papered and taped
5.0 on Google · 4 reviews

Kitchen Remodeling Across MD, DC and Northern VA

We redesign kitchen layouts and install the cabinets and counters, with every choice made and the price in writing before demolition starts.

Kitchen remodel contractors near you

We remodel kitchens within about 30 miles of Washington, DC. The job runs in a fixed order: demolition, rough-in, drywall, paint, cabinets, then a countertop templated off the installed cabinets.

  • Kitchen Renovation
  • Kitchen Cabinet Installation
  • Kitchen Countertop Installation
  • Kitchen Layout Redesign

Kitchen Renovation

The kitchen no longer works. Bad layout, dated cabinets, not enough counter, and every quote you have had is one number on one line.

Kitchen Cabinet Installation

You have cabinets, or are choosing them, and want them installed so the doors line up and stay lined up.

Kitchen Countertop Installation

The counters are failing or dated and you want them replaced without redoing the whole kitchen.

Kitchen Layout Redesign

The kitchen has the space but the layout wastes it, and new cabinets in the same places would not fix that.

Kitchen remodel worries we hear

That you lose your kitchen for months.

For most projects it is several weeks, with a gap in the middle while the countertop is templated off the installed cabinets. You get a schedule that shows that gap, so you can set up the fridge, a microwave and a kettle somewhere else before demolition. Living at home through a remodel.

That the price climbs once the old cabinets come out.

Pulling cabinets can show a leak under the sink, soft subfloor or wiring that has to change. We stop at that point, send you photos and write the fix up as a change order. It goes on the bill only once you have signed it. What moves a kitchen price.

That a whole week disappears because nobody disconnected the sink.

The scope names who disconnects the sink and the gas before demolition day. Your project manager books that plumber, and books the hookup again once the counter is set, so the cabinets never sit waiting on a trade nobody called.

That there will be dust through the whole house.

The path from your front door to the kitchen is covered, the dust is controlled, and the kitchen is swept clean when the crew leaves each day. It is one of the standards every job runs on, and you can ask for it in your scope.

When to Plan a Kitchen Around DC

April is the classic booking month for a kitchen, early enough to start right away, and summer is the busiest season for remodelers. Cabinets have lead times measured in weeks or months, so if you want to cook in the new kitchen by summer, the design and the cabinet order happen in winter. See how long a remodel takes.

Kitchen walkthroughs any day of the week

What will your kitchen remodel cost?

  • A free kitchen estimate, at the house or online
  • Cabinets, counters and layout priced line by line
  • The written number comes before demolition does

Rather talk the kitchen through?

(240) 695-4415

Start My Kitchen Estimate

We take insurance jobs. Financing may also be available for qualifying projects. Ask when you call.

How we run a kitchen remodel

We do not start demolition until your cabinets, counter and fixtures are chosen and the cabinets are ordered. That way the job never stops to wait on a decision while your kitchen is out.

  • The sink and gas disconnect is named in the scope before demolition day, because a disconnect nobody booked is the most common way a kitchen loses a week.
  • Your schedule shows the gap while the countertop is templated and made, so you can plan a temporary kitchen around it.
  • If the open walls show old wiring or galvanized pipe, we stop, show you photos and price the fix in writing before doing it.

Kitchen remodel questions, answered

How long does a kitchen remodel take?

⌄
Plan on the kitchen being out of action for several weeks. There is a pause in the middle, because the countertop can only be measured once the cabinets are in and then it has to be made. Your schedule shows that pause, so you can set up a temporary kitchen for it.

Who disconnects the sink and the gas?

⌄
Whoever the scope names, and on our jobs it names them before demolition day. A disconnect nobody was booked for is the most common way a kitchen loses a week.

Can I supply my own cabinets?

⌄
Yes, and plenty of people do. Get the full list confirmed against the layout before ordering, because a missing filler or the wrong wall cabinet stops an install day.

Can I live in my house during a kitchen remodel?

⌄
Most families do. The hard stretch runs from demolition until the countertop and sink go back in, when there is no sink or range. Set up a temporary kitchen in another room with the refrigerator, a microwave and a small table, and expect to wash dishes in a bathroom sink for a while. Your schedule marks those weeks before demolition starts.

What is the order of steps in a kitchen remodel?

⌄
Demolition, then rough plumbing, gas and electrical with inspections while the walls are open, then drywall repair and paint. Flooring usually goes down next, then cabinets. The countertop is templated off the installed cabinets, made and set, and the backsplash goes on last. Cabinets and other long-lead items are ordered before demolition, so the sequence never stops for a delivery.

How long do cabinets take to arrive after ordering?

⌄
It depends on the line, and the maker gives the date when the order is placed. Stock cabinets are built ahead and can be on hand quickly. Semi-custom and custom lines are built after you order, so they take longer, and an unusual finish or size adds to that. We order before the old kitchen comes out, so the delivery date sets the demolition date and you are not left without a kitchen while you wait.

Do I need a permit for a kitchen remodel in DC or Maryland?

⌄
Yes, if the work moves plumbing, gas, wiring or a wall. In DC the permit comes from the Department of Buildings. In Maryland it comes from the county, such as Montgomery County's Department of Permitting Services or Prince George's County's DPIE, and in those two counties WSSC Water issues the plumbing and gas permits. New cabinets and counters in the same places may need less, and the permit office makes that call. The written scope names who pulls each permit.

When should I pick appliances, before or during the remodel?

⌄
Before. The cabinet layout is drawn around each appliance's exact width, height and depth, and the hood duct, gas line and refrigerator water line are planned from the spec sheets. Choosing them before the cabinets are ordered avoids a cabinet built for a refrigerator you then cannot get. Delivery can wait until the counters are in.

Quartz vs granite countertops, which is better for a busy kitchen?

⌄
For most busy kitchens, quartz. It is an engineered slab that never needs sealing and shrugs off everyday spills. Granite is natural stone. It handles heat better but needs resealing now and then so oil and wine do not soak in. Quartz can scorch or discolor under a hot pan, so use a trivet with either. Both are templated off the installed cabinets and leave the same gap in the schedule.

What are the most common kitchen remodel regrets?

⌄
Most are about layout and storage rather than finishes. Too little counter next to the range or sink. An island that leaves a walkway too tight for two people. Upper cabinets nobody can reach and a corner cabinet that swallows pots. Too few outlets, a single ceiling light, and a hood that does not vent outside. Nearly all of them can be settled on paper before demolition, which is why the layout gets decided before the door style.

How do I avoid delays during a kitchen remodel?

⌄
Make every choice before demolition. Cabinets, counters, sink, faucet, tile and appliances picked and ordered, and the sink and gas disconnect named in the scope. Kitchens lose most of their time waiting, on a late cabinet, an undecided tile or a disconnect nobody booked. The gap while the countertop is made is normal and belongs on the schedule from the start.

What if my remodeler finds plumbing or wiring that is not up to code?

⌄
It should be shown to you and priced in writing before anyone fixes it. In older houses around DC, opened kitchen walls often turn up knob and tube or cloth-covered wiring and galvanized supply lines. Once a wall is open under a permit, the inspector expects the work in it to meet code, so leaving it is rarely an option. Our estimates say what they assume is in the walls, so a change order follows a known process instead of landing on the final bill.

How do I find a kitchen remodeler who works in Capitol Heights?

⌄
Ask whether the company works in Prince George's County and pulls permits there. We do. Capitol Heights is a few miles east of the Capitol, well inside the 30 miles around Washington that we cover. Kitchen permits there run through Prince George's County, with WSSC Water handling the plumbing permit, and the town may want its own sign-off as well, so we check the address first. Send the address and a few photos to book a walkthrough.

My kitchen is already gutted, can a remodeler take over a half finished job?

⌄
Often, yes. We start by walking what is there: what came out, what has been roughed in, which inspections passed and which materials are on site. If the first contractor pulled a permit, the permit office has to know who is finishing the job, and that is settled before work starts. You then get a written price for the rest, with anything we cannot vouch for, such as wiring we did not see go in, named and priced to open up and check.

How soon can a kitchen remodel start if I am ready now?

⌄
The walkthrough can happen soon. Estimates are booked seven days a week, and a next-day visit is possible when it does not clash with another appointment. The start date depends on the cabinets and any permit. Cabinets are ordered first and demolition is set for when they will arrive, so being ready now mostly means having your choices made now.
Bonded & insured60 to 90 day warranty on our workSince 2020How every project runs →