
Kitchen Remodeling Across MD, DC and Northern VA
We redesign kitchen layouts and install the cabinets and counters, with every choice made and the price in writing before demolition starts.
Kitchen remodel contractors near you
We remodel kitchens within about 30 miles of Washington, DC. The job runs in a fixed order: demolition, rough-in, drywall, paint, cabinets, then a countertop templated off the installed cabinets.
- Kitchen Renovation
- Kitchen Cabinet Installation
- Kitchen Countertop Installation
- Kitchen Layout Redesign
Kitchen Renovation
The kitchen no longer works. Bad layout, dated cabinets, not enough counter, and every quote you have had is one number on one line.
Kitchen Cabinet Installation
You have cabinets, or are choosing them, and want them installed so the doors line up and stay lined up.
Kitchen Countertop Installation
The counters are failing or dated and you want them replaced without redoing the whole kitchen.
Kitchen Layout Redesign
The kitchen has the space but the layout wastes it, and new cabinets in the same places would not fix that.
Kitchen remodel worries we hear
That you lose your kitchen for months.
For most projects it is several weeks, with a gap in the middle while the countertop is templated off the installed cabinets. You get a schedule that shows that gap, so you can set up the fridge, a microwave and a kettle somewhere else before demolition. Living at home through a remodel.
That the price climbs once the old cabinets come out.
Pulling cabinets can show a leak under the sink, soft subfloor or wiring that has to change. We stop at that point, send you photos and write the fix up as a change order. It goes on the bill only once you have signed it. What moves a kitchen price.
That a whole week disappears because nobody disconnected the sink.
The scope names who disconnects the sink and the gas before demolition day. Your project manager books that plumber, and books the hookup again once the counter is set, so the cabinets never sit waiting on a trade nobody called.
That there will be dust through the whole house.
The path from your front door to the kitchen is covered, the dust is controlled, and the kitchen is swept clean when the crew leaves each day. It is one of the standards every job runs on, and you can ask for it in your scope.
When to Plan a Kitchen Around DC
April is the classic booking month for a kitchen, early enough to start right away, and summer is the busiest season for remodelers. Cabinets have lead times measured in weeks or months, so if you want to cook in the new kitchen by summer, the design and the cabinet order happen in winter. See how long a remodel takes.
What will your kitchen remodel cost?
- A free kitchen estimate, at the house or online
- Cabinets, counters and layout priced line by line
- The written number comes before demolition does
Rather talk the kitchen through?
(240) 695-4415Start My Kitchen Estimate
We take insurance jobs. Financing may also be available for qualifying projects. Ask when you call.
How we run a kitchen remodel
We do not start demolition until your cabinets, counter and fixtures are chosen and the cabinets are ordered. That way the job never stops to wait on a decision while your kitchen is out.
- The sink and gas disconnect is named in the scope before demolition day, because a disconnect nobody booked is the most common way a kitchen loses a week.
- Your schedule shows the gap while the countertop is templated and made, so you can plan a temporary kitchen around it.
- If the open walls show old wiring or galvanized pipe, we stop, show you photos and price the fix in writing before doing it.