Frequently Asked Questions

Common Questions About
Remodeling Work

Ready to start? Get a free quote or see how every project runs.

Working With Us

What does All Purpose Remodelers take on?

Remodeling, inside and outside the house.

Inside: kitchens, bathrooms, basements, flooring, interior painting, drywall and wall repair, interior carpentry, room renovations, accessibility and aging-in-place work, and whole-home projects, including garage and attic conversions.

Outside: siding, exterior painting, windows, doors, decks, exterior carpentry and exterior repairs.

Roofing, plumbing and HVAC are not on that list, so we do not take them on.

Where do you work?

Washington DC, Northern Virginia and the Maryland suburbs.

We work from one location: 6965 Heather Drive, Suite A, Bryans Road, MD 20616. Every other town on this site is a service area, not another office.

Each town page covers the permit and review rules that change the schedule there.

Which counties and cities do you cover?

In Maryland: Charles County, Prince George's County and Montgomery County.

Washington DC.

In Northern Virginia: the suburbs, including Alexandria, Arlington and Falls Church, and in Fairfax County Reston, Herndon, Great Falls, Tysons Corner, McLean and Vienna.

Not sure your street is in? Call with the ZIP code and you get a straight yes or no.

Who runs the project day to day?

One project manager. From demolition through the final caulk line.

That person books the trades, orders them in the right sequence and is the one you call. You are not chasing a tile setter, a painter and a carpenter on three different phones.

Most remodels lose time in the gaps between trades, not in the work itself.

How far ahead do you book?

Consultations are usually within a week or two.

Estimates are by appointment, seven days a week. A next-day walkthrough can be booked when it does not clash with another appointment.

The start date depends on the size of the project and on permits where they apply. You get a real date, not an optimistic one.

Do we have to move out?

Usually not.

The question is whether the kitchen and the bathrooms are out of use at the same time. If one of them still works, most families stay.

We tell you up front which weeks are hard to live through, so you can plan around them.

Can you work outside business hours?

Yes. Tell us the window and the work is planned to fit it.

Crews work 7:00 AM to 7:00 PM, Monday to Sunday. Weekends are normal working days for us.

Commercial clients can book short-notice, after-hours and weekend work. It is quoted per job.

Outside our hours, send the form or leave a message. We respond during business hours.

Do you warranty your work?

Yes. Our work carries a 60 to 90 day warranty.

The term depends on the job. Ask which one applies to your project when the written scope comes through.

If something we did is not right inside that window, call the same number. The same company comes back.

Pricing and Permits

How is a remodel priced?

From a written scope.

Quantities and selections are written down before demolition.

Anything not chosen yet is named as an allowance with a figure next to it. So you can see which numbers are firm and which will move.

You get the price in writing before work starts.

What is an allowance in a renovation price?

A named budget for something you have not picked yet.

Renovations are priced by scope, with allowances for anything not yet selected. Tile, fixtures, cabinets and counters are the usual ones.

Every allowance is named. You can see which numbers are firm and which will move when you choose the tile.

An allowance with no figure and no grade of material next to it is a placeholder, not a price.

Do you handle permits?

Yes. Where the work needs a permit, we pull it and schedule the inspections.

Some places add a review before the permit. A historic district in DC, the BAR districts in Alexandria and St. Charles in Waldorf all do. That time goes in the schedule from the start.

Who pulls the permit, you or me?

It is named in the written scope before work starts.

For most projects we pull them. For some, the owner does.

A permit nobody owns is how a job stops for a week.

Are you bonded and insured?

Yes.

That includes workers' compensation and business liability coverage on every job.

If someone is hurt or something is damaged, that is our problem, not yours.

Are you insured in Maryland, DC and Virginia?

Yes, in all three.

All Purpose Anytime Services LLC, the company behind All Purpose Remodelers, is bonded and insured across Maryland, DC and Virginia.

Ask for the certificate and we will send it.

Do you provide a certificate of insurance?

Yes, with the proposal.

Tell us who it needs to be addressed to. A condo board, a property manager or your lender may each want their own name on it.

What is the 30% rule in remodeling?

A rule of thumb, not a law, code or lender rule: keep a remodel under about 30 percent of what the house is worth.

A house on a given street only sells for so much, and money spent past that point is money you live with, not money you get back.

Use it as a check, not a budget. Selling soon? A refresh usually makes more sense. Staying for years? The remodel is for you.

How much remodeling can be done with $100,000?

It depends on how many rooms, whether walls, plumbing or gas move, your cabinet, tile and fixture picks, and what the open walls turn up. The same budget buys very different work in two houses, so we do not publish what a fixed sum buys.

Tell us the budget at the start and the estimate is written to it, room by room, with every allowance named.

Want a full written budget before you commit to anyone? The paid Remodel Scope and Budget Plan does that, and the fee is credited toward the work if you book with us.

Kitchens and Bathrooms

How long does a kitchen remodel take?

For most projects, the kitchen is out of use for several weeks.

There is a gap in the middle. The countertop is templated off the installed cabinets, then made, then installed. The backsplash cannot start until the counter is in.

Your schedule shows that gap. Cabinets, counters and tile are chosen before the old kitchen comes out, so the job never waits on a decision.

Who disconnects the sink and the gas?

It is named in the written scope before the job starts.

Leaving it open is the single most common reason a kitchen loses a week. Demolition cannot start until the sink and the range are off, and the counter cannot be set until they can go back on.

How long does a bathroom remodel take?

Commonly two to three weeks for a full renovation.

Tile, waterproofing and finishing all need drying and curing time.

A bathroom done in half that time usually skipped a cure, and it shows years later at the shower curb or corners.

Can we live at home during a bathroom remodel?

Yes. If it is the only bathroom, plan around a period with no shower.

Tell us at the start. We phase the work to shorten that stretch as far as it can go.

What adds the most value to a kitchen?

It depends on your plans: selling soon, or staying put.

Selling soon: a refresh. New hardware, lighting and counters, fresh paint, and anything an inspector will flag. A gut remodel or luxury upgrades right before listing rarely come back.

Staying: a kitchen that works. Counter beside the range, a reachable sink, usable storage. Layout first, finishes second.

What to avoid when renovating a bathroom?

Avoid these, in order of what they cost you later.

Tile with no waterproofing behind it. Cement board is not waterproofing. Without a real membrane, flood-tested before tile, the shower leaks at the corners and the curb into the room below.

A fan that vents into the wall or the attic instead of outside. A shower floor that does not slope to the drain. Choosing the tile before the layout, so the niche and the bench get decided on install day.

No blocking behind the wall for grab bars while it is open. One light over the mirror instead of light from the sides. And skipping the permit when plumbing or electrical changes.

What adds the most value to a bathroom?

A bathroom that is sound. A soft floor, a leaking shower or a fan venting into the wall are what an inspector flags and what a buyer prices in, so fixing them comes first.

Before a sale, new fixtures, fresh caulk and better light go a long way. A full gut right before listing usually does not come back.

If it is the only tub in the house, think before converting it to a shower. A house with no tub at all is a harder sell to families.

Basements and Whole Homes

Can I add a bathroom in my basement?

Usually.

How depends on where the drain line sits. Above the slab is the simpler job.

Below the slab means breaking concrete. That changes both the price and the schedule, and you should know which one you have before you plan the room.

Do I need a permit to finish my basement in DC or Maryland?

For a basement finish, generally yes.

For anything involving egress windows or plumbing, certainly. The local permit office decides what your project needs.

Which office depends on the address. In DC, the Department of Buildings. In Maryland, the county: Montgomery County's Department of Permitting Services, or Prince George's County's Department of Permitting, Inspections and Enforcement in Largo. In Fairfax County, Virginia, including Tysons Corner, Land Development Services.

Who pulls it is written into the scope before work starts.

How much does it cost to finish a basement?

It depends on the basement more than on its size.

Five things move the number most: whether water is getting in, the ceiling height once the floor and ceiling are finished, an escape window for any bedroom, a bathroom and where its drain sits, and whether the space stays part of the house or becomes a rental unit.

Flooring rated for below grade, the ceiling type and the heating and cooling runs move it after that.

We do not publish a single figure. After the walkthrough you get a free basement estimate in writing, with every allowance named.

How much does it cost to remodel a basement that is already finished?

It depends on how much of the old finish can stay.

Anything built over a damp wall comes out, and the water is dealt with before new work goes up.

From there it is priced line by line like a new finish: walls, ceiling, floor, lighting and any bathroom. The walkthrough shows what is worth keeping.

How much does it cost to add a basement entrance?

It depends on what is there to start from.

An existing areaway, outside stairwell or rear door makes it a smaller job. A new one means cutting the foundation wall, building the stairs down and hanging the door.

In a DC historic district, a new basement door you can see from the street goes to the Historic Preservation Review Board before the permit.

We price it once we have seen the wall and the yard.

How much does it cost to sheetrock a basement?

It is priced on the area of wall and ceiling, the board used and the finish level written into the scope.

Below grade, the foundation walls get insulation before any board goes up. A ceiling wrapped around ducts and pipes takes longer than a flat one, which is why some owners pick a drop ceiling and keep the pipes reachable.

Send the room sizes and we can give you a figure.

Can a basement have a bedroom?

Yes, if two things are true.

There is a way out in a fire: a window of the right size with a well you can climb from, or a door to outside.

And the ceiling still clears the code minimum after flooring and drywall. Under the International Residential Code that is generally 7 feet.

Both are measured at the walkthrough, before a price.

Can a basement that takes water be finished?

Yes, once the leak is solved.

Sometimes the cause is outside and cheap, such as a downspout emptying at the foundation or a clogged areaway drain. Sometimes it takes an interior drain and a sump.

We find which before anything is framed, and the fix is its own line in the price.

Do we need to move out for a whole-home remodel?

Not always.

It depends on two things. Whether the kitchen and bathrooms come out at the same time. And how much dust you can live with.

We tell you which weeks are hard before the job starts, so you can decide.

How is a whole-home remodel priced?

By scope, with allowances for selections not yet made.

Everything with an allowance is named. You can see which numbers are firm and which will move when you choose.

On a job this size, the order matters as much as the price. Heating, plumbing, electrical and windows come before kitchens and paint.

What is the correct order of renovation?

The systems first and the finishes last.

Structure and anything that moves a wall come first. Then heating, plumbing, electrical and windows, while the walls are open. Then insulation, drywall and the inspections that have to pass before anything is closed up. Then cabinets, tile, floors, trim and paint.

Inside a single kitchen it runs the same way: demolition, rough plumbing and electrical, drywall repair, paint, cabinets, then the countertop template, then the backsplash.

Long-lead items such as cabinets and windows are ordered before demolition. The wrong order means opening finished work to run a pipe.

Walls and Trim

Can you match existing trim?

Usually.

Trim profiles from the 1950s onward can generally be matched or closely approximated.

Older or custom profiles may need to be milled. That adds cost and lead time, and we tell you before you commit.

What finish level should the walls be?

Level 4 is standard for most rooms.

Level 5 is worth it where a wall takes raking light or a gloss paint. Low sun across a long wall shows every seam.

We point out which walls in your house those are. The finish level goes in the written scope, because the price and the look both come from it.

How do I know if my wall is load-bearing?

It comes down to the joist direction and what sits on top of the wall.

On the first visit we check from the basement or crawl space and from the floor or attic overhead, and the verdict goes into the scope in writing.

A partition can simply come out. A carrying wall is replaced by a beam an engineer specifies, with posts under each end, and that changes both the permit and the price.

Do I need a permit to take out a wall?

Taking out a carrying wall is structural, so yes.

The local permit office decides what your wall needs: the Department of Buildings in DC, the county in Maryland, and in Virginia the county or city, for example Fairfax County Land Development Services for Reston or Tysons Corner.

Any outlet, switch or pipe that has to move goes to a licensed electrician or plumber, and the scope says who applies for each permit.

Can you take out a wall in a townhouse?

Inside walls, often.

Party walls, the ones you share with the house next door, are not touched. Interior partitions and carrying walls inside your own unit can be.

If your association has rules on noisy hours or where a dumpster can sit, send them and the schedule follows them.

Will the floor match where the wall was?

Often it can be patched in, and you hear which before demolition.

If the old floor continued under the wall, only a narrow strip is missing and it gets filled with the same material.

If each room had its own floor, we also price one continuous floor across the new opening as an option, so you can compare.

What maintenance does wood moulding need to stay in good shape?

A yearly check, in spring.

Push a screwdriver into the moulding, the sills and the corner boards. It should not sink in.

Recaulk anywhere the caulk has cracked or pulled away, and prime bare wood before it peels. Replacement wood gets primed on every face, cut ends included.

Soft wood found early is a small repair. Found in three years, it is a replacement.

Something we did not answer?

Call us or request a free estimate. Open every day, 7:00 AM to 7:00 PM.