Our Work
Projects
Photographs from our own job sites, with a plain description of what is in each one. No stock images, no staged rooms, no claims we cannot show you. Each caption names the service, so you can go straight from the photo to what that work involves and what moves its price.

Finished Kitchen, Two-Tone Cabinets
A completed kitchen remodel with navy lower cabinets, white uppers and a butcher-block island. Cabinets, counters and the island were set after the rough work behind the walls was finished and inspected.

Countertop Going On Over New Cabinets
A carpenter fitting a countertop over newly installed base cabinets, with the floor papered and taped for protection. This is the stage after cabinets are set and before the backsplash can start.

Large-Format Wall Tile In A Bathroom
A tiler setting large-format wall tile around a new vanity and a tiled shower with a recessed niche. The waterproofing behind this tile was finished and tested before the first piece went on.

Basement Framed And Ready For Drywall
A lower level mid-conversion: new stud walls framed out, joists and ductwork overhead, and drywall stacked ready to hang. Moisture was checked and dealt with before the framing went in.

Several Trades Working At Once
A house mid-renovation with several trades working around a new kitchen, cabinets set and the floor still papered. On a whole-home job the order the trades run in is what keeps the schedule.

Finish Coat Beside A New Door Casing
A painter rolling a finish coat onto an interior wall beside a freshly cased doorway. Paint is the last trade in, after drywall and trim, and the second coat is in every one of our scopes.

Framing And Decking A New Porch
A crew framing and decking a new porch, with a third carpenter trimming the post against the siding. The ledger and framing are the part of a deck that matter most, and the part you see least.

Lap Siding And Corner Trim Replacement
A carpenter replacing lap siding and corner trim, with the sheathing and the rot behind it opened up. Finding where the water got in comes before the new board goes on.
What Every One of These Jobs Had in Common
A written scope and price before work started, one project manager from demolition to the final walk-through, and the 60 to 90 day warranty after. How that runs is on our standards, and the licence and insurance behind it are on our credentials page.