
Interior Renovation, and What to Specify Where
Several rooms at once, each with materials picked for what that room takes, from a wet bathroom floor to boots at the back door.
Specifying by room, not by preference
The same product can be right in one room and a callback in the next. These are the calls worth getting right at specification.
- Opening up a floor plan
- Multiple rooms at once
- Flooring throughout
- Drywall and plaster repair
- Interior doors and trim
- Painting after the work
Step 1
We agree what is staying and what is going, room by room.
Step 2
Walls and ceilings are repaired or skimmed to a named finish level.
Step 3
Electrical changes for lighting go in while surfaces are open.
What Changes the Price
Number of rooms and the condition of the surfaces
What Changes the Price
Finish level on the walls and ceilings
What Changes the Price
How much trim and how many doors are replaced
Room renovation worries
That the walls still look rough under the new paint.
Walls and ceilings are repaired or skimmed to a named finish level. Level 4 suits most rooms, and Level 5 is for a wall that takes raking light or gloss paint. We point out which walls in your house are the ones that will show.
That the renovated room will not match the rest of the house.
Where we work into existing trim, the profile is matched from a cut sample. Where an exact match does not exist, the closest one is agreed with you before anything is ordered.
That it is never quite finished.
The job ends with a daylight walk through each room with you. Anything that is not right goes on a punch list and gets put right, and the work carries a 60 to 90 day warranty, with the exact term written into your scope.
When to Renovate a Room Around DC
If the room has to be ready for holiday guests, count back from mid November, which is when contractors describe the rush to finish. Winter is quieter, and availability tends to improve for indoor work. See the remodeling year around DC.
Price the rooms you want redone
- Free to walk the rooms with us, or start online
- Finish level for the walls written into the scope
- Floors, trim, doors and paint on a single quote
Several rooms in mind? Call:
(240) 695-4415Room Renovation Estimate
We take insurance jobs. Financing may also be available for qualifying projects. Ask when you call.
How room renovations run
- 1We agree what is staying and what is going, room by room.
- 2Walls and ceilings are repaired or skimmed to a named finish level.
- 3Electrical changes for lighting go in while surfaces are open.
- 4Flooring, trim and doors.
- 5Prime and paint, then a walk-through in daylight before the drop cloths come up.
We check the wall before we price it
Before we price taking out a wall, we look from below and above to see whether it carries a floor or the roof, and the verdict goes into the scope in writing. A carrying wall is replaced by a beam an engineer sizes, with posts under each end.
- Walls and ceilings are finished to a level named in the scope, so the look you get is the one the price was for.
- Any outlet, switch or pipe that has to move goes to a licensed electrician or plumber under the permit.
- Where the two rooms had different floors, we also price one continuous floor across the opening so you can compare it with a patch.