Skip to main content
A lower level mid-conversion with new stud walls framed out, joists and ductwork overhead, and drywall stacked ready to hang
5.0 on Google · 4 reviews

Basement Remodeling Across MD, DC and Northern VA

The damp gets fixed first. Then we frame and finish the basement into rooms you can use, with the ceiling height and the egress measured before the price.

Basement remodeling services we offer

Dampness, efflorescence or a sump that runs often gets solved before anything is framed. Finishing over moisture costs you the finishes as well as the fix. That holds for a new finish, for basement refinishing in Maryland, DC or Virginia, and for a multi-purpose basement remodeling job that puts a family room, an office and a guest room on one floor.

  • Basement Finishing
  • Basement Renovation
  • Basement Bathroom Addition

Basement Finishing

There is a floor of the house doing nothing, and you want it to be rooms.

Basement Renovation

The basement was finished at some point and it shows, or it was finished over a problem.

Basement Bathroom Addition

The basement needs a bathroom, and you have been told it may mean breaking the floor.

Basement worries, answered

That you finish it and the water comes back.

Dampness, efflorescence on the block or a sump that runs often gets solved before anything is framed. Finishing over a moisture problem hides it for a year and then costs you the finishes as well as the fix. Where DC basement moisture starts.

That breaking the floor for a bathroom turns into a surprise bill.

Before you compare prices, ask each contractor where your main drain sits. If it runs under the slab, a basement bathroom means cutting the floor open and pouring it back, and a quote that leaves that out is not cheaper, only unfinished.

That the permit gets skipped and comes up when you sell.

A basement finish generally needs a permit, and anything with egress or plumbing certainly does. Who pulls it is written into the scope before work starts.

When Basements Show Their Problems Around DC

The wettest months here are typically May, June and July, and the region's heaviest rain often comes from storm remnants around the September 10 peak of hurricane season. A basement that stays dry through both has told you something. Basement work is indoors, so fall and winter are good months to build. See what it costs to finish a basement.

Basement visits on any day you choose

Find out what your basement will cost

  • Free basement estimate, on site or from what you send us
  • Any damp named and priced before framing is
  • Bathroom drain above or below the slab, answered in the quote

Want to ask about the basement first?

(240) 695-4415

Basement Estimate Request

We take insurance jobs. Financing may also be available for qualifying projects. Ask when you call.

Water first, then framing

We find and fix where water gets into a basement before a single stud goes up. Finishing over damp costs you the finishes as well as the fix.

  • The ceiling height is measured at the walkthrough, allowing for the finished floor and ceiling, before you plan rooms around it.
  • Any room meant for sleeping gets its escape window or door checked before the price, because that decides whether it can be a bedroom.
  • Whether the bathroom drain sits above or below the slab is answered in the quote, before anyone touches the concrete.

Basement finishing questions

Can I add a bathroom in my basement?

⌄
Most basements can take one. The deciding question is where the main drain runs. Above the slab is the simpler job. Below it, the concrete has to be cut and patched, which adds cost and days.

Do I need a permit to finish my basement in DC or Maryland?

⌄
Generally yes, and the local permit office decides what your project needs. In DC that is the Department of Buildings. In Maryland it is the county, such as the Montgomery County Department of Permitting Services or the Prince George's County Department of Permitting, Inspections and Enforcement. An egress window or new plumbing always needs one. Your scope says who is pulling it before anything starts.

How much does it cost to finish a basement?

⌄
How much to finish a basement depends on a few things more than on the square footage: whether water is getting in, the ceiling height, whether a bedroom needs an egress window, whether a bathroom goes in and where the drain sits, and whether it stays part of the house or becomes a rental unit. Floors, ceilings and the heating and cooling runs move it too. We measure those at a free walkthrough and put the price in writing.

How much does it cost to remodel a basement that is already finished?

⌄
A basement renovation starts with what is already there. If the old finish went up over a damp wall, that part comes out and the water gets fixed first. After that it prices like a new finish, line by line: walls, ceiling, floor, lights and any bathroom. The walkthrough shows how much can stay, and the written estimate is free.

How much does it cost to add a basement entrance?

⌄
It turns on whether there is already a stairwell, an areaway or a rear door to work from. A new entrance means cutting the foundation wall, building the stairwell and setting the door. In a DC historic district, a new basement door that shows from the street needs Historic Preservation Review Board approval before the permit. We price it after seeing the wall and the yard.

How much does it cost to sheetrock a basement?

⌄
Drywall is priced on the wall and ceiling area, the board type and the finish level agreed in writing. Below grade the foundation walls are insulated first, and a ceiling boxed around ducts and pipes takes longer than a flat one. Some basements get a drop ceiling instead so the pipes stay reachable. Tell us the size of the space and we will put a figure on it.

How long does a basement remodel take?

⌄
Weeks rather than days, and the inspections set the pace more than the carpentry. Any water fix comes first. Then framing, the rough plumbing, electrical and duct runs, an inspection, insulation, another inspection, drywall with drying time between coats, and finally flooring, trim, doors and paint. A bathroom or an egress window adds its own steps. You get the timeline in writing with the scope.

What permits do I need to finish a basement in Montgomery County?

⌄
A building permit from the Department of Permitting Services covers the framing, insulation and any new egress window. The wiring needs its own electrical permit, pulled by a licensed electrician. A bathroom or wet bar adds a plumbing permit, which in Montgomery County comes from WSSC Water. The scope names who pulls each one before work starts.

Does my basement need an egress window to add a bedroom?

⌄
Yes, unless the room has a door straight to the outside. The International Residential Code wants an emergency escape opening in every sleeping room, at least 20 inches wide and 24 inches high with a minimum clear area, a sill no more than 44 inches above the floor, and a window well big enough to climb out of. The local code office has the final word. Cutting one into a foundation wall is a job of its own, so we check it before the room is planned.

What has to happen before framing starts in a basement?

⌄
The water question gets answered and any fix done. The ceiling height is measured to see what the finished room can be, the drain is located if a bathroom is planned, and the permit is in hand. Ducts, pipes and wiring that need to move are planned now, because once studs are up, moving them costs twice. How the foundation walls will be insulated is decided before any stud goes against them.

Can a bathroom be added to a basement that has no plumbing?

⌄
Usually, yes. A drain has to reach the house's sewer line. If the sewer leaves the house below the basement floor, the slab is cut and a new drain runs to it. If it leaves above the floor, waste is lifted by an ejector pump set in a pit in the slab. Supply lines and a vent are the easier part. We find out which case you have before we price it.

Full finish vs partial finish, which makes sense for my budget?

⌄
A partial finish makes sense when money is tight or part of the basement has to stay a utility space anyway. Finish the dry, tall part as a room and leave the furnace, water heater, laundry and any low or damp section as storage. Finishing in stages also works if the first stage includes what goes behind the walls for later, such as a roughed-in drain for a future bathroom. A full finish costs more now and saves a second round of construction later.

What flooring works best in a basement, luxury vinyl, tile, or carpet?

⌄
Luxury vinyl plank, in most basements. It is waterproof, goes over a slab with the right underlayment and survives a minor leak. Tile handles water best but is cold and hard underfoot and needs a flat slab. Carpet is warm, holds moisture, and is the first thing thrown out after any water. Whatever you pick, the slab is checked for moisture first.

Open plan basement vs separate rooms, what do most people choose?

⌄
It depends on who will use the floor. Open plan suits a family room, a play area or a gym, lets light from the few windows reach the whole space, and costs less in framing, doors and lighting. Separate rooms suit a guest bedroom, an office that needs a closed door, or a rental. Plenty of basements end up as both: one open room, with a bedroom, bathroom or office walled off.

Should I add a kitchenette or wet bar to my basement?

⌄
Add one if the basement will be lived in on its own, by guests who stay for weeks, a parent, or teenagers you would rather keep downstairs. A wet bar needs a supply line and a drain, so it costs least near existing plumbing or a planned bathroom. A full kitchen with a range is a bigger step. In DC it can make the basement a separate unit in the permit office's eyes, with rental rules to follow.

What if my basement gets water after heavy rain?

⌄
Find where it comes in before finishing anything. After heavy rain the cause is often outside: a downspout emptying against the foundation, ground sloping toward the house, or a clogged areaway or window well drain. Those are the cheaper fixes. Water coming up through the floor or the joint where wall meets slab takes an interior drain and a sump. We find the source at the walkthrough and price the fix as its own line.

Does a basement need waterproofing before it is finished?

⌄
It needs whatever stops the water it actually gets, and for some basements that is a downspout extension. A dry basement still gets insulation against the foundation wall and flooring rated for below grade. One with water coming through the wall or slab gets the fix first, which may be an interior drain and a sump. Waterproofing sold before anyone finds the source is money spent on a guess.

How do you deal with low ceilings in a basement remodel?

⌄
Measure first, then work around the lowest point. Ducts and beams hanging below the joists are usually the problem, so the options are tight soffits along one wall, moving a duct run up into the joist bays, or a flat drywall ceiling instead of a drop ceiling to keep a few more inches. If part of the room still falls under the code minimum for living space, it can be storage or a utility room. Digging the floor down is the costly last resort.

What are the most common basement remodel regrets?

⌄
Finishing before fixing the water is the big one, because the finishes come out with the fix. After that: carpet on a slab that gets damp, a ceiling with no way to reach the shutoff valves and cleanouts, too few lights and outlets for a floor with little daylight, no egress window in a room that later has to be a bedroom, and no rough-in for the bathroom you decide you want two years on.

Can finishing a basement cause moisture or mold problems later?

⌄
It can, if the basement was damp to start with or the walls are built wrong. Fiberglass batts and paper-faced drywall against a cold foundation wall trap condensation, and that is where mold starts. Rigid foam against the concrete, framing kept off the wall, moisture-resistant board near the floor and a dehumidifier where the air stays humid keep a finished basement dry. Fixing any water first matters more than all of it.

How do I know a basement remodel meets code?

⌄
By the permit and its inspections. A permitted basement is inspected at framing, at the electrical and plumbing rough-in, at insulation and at the end, and the final inspection is your record that it passed. Ask for the permit number before work starts and a copy of the final inspection when it ends. On our jobs the scope names who pulls the permit, and the inspections are on the schedule.

Will a finished basement without permits hurt me when I sell?

⌄
It can. A buyer's inspector or agent may ask for the permit record, and an appraiser may not value unpermitted space as a finished room. Some buyers ask for a lower price because of it. Getting a permit after the fact usually means opening walls so the inspector can see the wiring, plumbing and framing. If you are finishing now, pull the permit now.

What should a basement remodel contract cover?

⌄
What will be done about water, with that fix priced on its own line. The ceiling height the finished room will have, egress for any bedroom, where the bathroom drain goes and whether it needs an ejector pump. Then the insulation, the drywall finish level, flooring, lights and outlets, heating and cooling runs, every allowance with a figure, who pulls the permit, the schedule, the payment schedule and the warranty.

Should the remodeler test for moisture before quoting?

⌄
Yes. A basement quote that never mentions water is a quote for a basement that may be redone. The walls and floor should be checked for moisture, and the outside looked at for downspouts, grading and window wells. We do that at the walkthrough, before any price.

My basement flooded and the drywall is ruined, can a remodeler handle the rebuild?

⌄
Yes, the rebuild is work we do once the space is dry. First, stop the source if water is still coming in, stay away from wet outlets, and switch off power to the basement at the breaker if you can reach it without standing in water. Wet drywall, insulation and carpet have to come out and the space dried, usually by a water mitigation company. Then we replace what needs it, framing, insulation, drywall, flooring and trim, and fix how the water got in. We do not offer emergency service. We are open 7:00 AM to 7:00 PM every day.

How soon can a basement remodel start after water damage is fixed?

⌄
Once the framing and slab are dry and the cause of the water is fixed. Building over damp framing traps the moisture you just paid to remove. We check the walls and floor at the walkthrough. If they are dry and the source is fixed, the start date depends on the permit and the materials. If they are not dry yet, we wait.
Bonded & insured60 to 90 day warranty on our workSince 2020How every project runs →