Home Additions Across MD, DC and Northern VA
Additions built on their own foundation and tied into your walls and roof, with setbacks and lot coverage checked before anything is drawn.
Home addition services we offer
Zoning and setbacks come first, then design and engineering, then foundation, framing and roof tie-in, made weathertight before any interior work. A home addition in Maryland, DC or Northern Virginia follows that order, from bump-out additions to a second storey.
- Room Additions
- Bump-Outs and Kitchen Extensions
- Second-Storey Additions
- Primary Suite Additions
- Sunrooms and Enclosed Porches
- Garage and In-Law Additions
Room Additions
A family room, bedroom or office added onto the side or back of the house, on its own foundation.
Bump-Outs and Kitchen Extensions
The kitchen can only work if the wall moves outward by a few feet. A bump-out buys the space without a full addition.
Second-Storey Additions
Building up when the lot will not let you build out. The existing structure is checked for what it can carry before anything is drawn.
Primary Suite Additions
A bedroom and bath added on one level, often for a household that needs a ground-floor suite.
Sunrooms and Enclosed Porches
A conditioned room where a porch or patio is now, built to be used in January as well as June.
Garage and In-Law Additions
An attached garage, or a suite with its own entrance for a parent or an adult child moving home.
What people ask about additions
How long does an addition take?
Months, not weeks, and the approvals before anyone breaks ground take a meaningful share of that. We give you that part of the timeline separately so it is visible from day one.
Can my furnace and panel handle the extra space?
Sometimes. Heating, cooling and electrical capacity are checked before pricing, because a new system is a different number from an extended one.
Addition worries, answered
That it looks bolted on.
It will if the roofline, siding and window proportions are not matched. Those three are decided at design, not at the end.
That halfway through you hear the furnace or the panel cannot carry it.
Heating, cooling and electrical capacity are checked before pricing, because a new system is a different number from an extended one.
That it takes far longer than anyone said.
An addition takes months rather than weeks, and the approvals before anyone breaks ground are a real share of that. We give you that part of the timeline separately, so it is visible from day one.
That the house is open to the weather for weeks.
The foundation, the framing and the roof tie in are made weathertight before any interior work starts.
When to Start an Addition Around DC
Foundation and outside work want ground that is past freezing, and the average last spring freeze in Washington is April 1. Zoning, design and permits take months, so a spring start is planned the fall before. See where remodel time goes.
Find out what an addition takes on your lot
- A free first visit to the house and the lot
- Approvals and design shown as their own part of the timeline
- Heating and electrical capacity checked before the price is set
Outgrowing the house? Call:
(240) 695-4415Home Addition Consultation
We take insurance jobs. Financing may also be available for qualifying projects. Ask when you call.
How an addition gets built
- 1Zoning, setbacks and lot coverage are checked first, because they decide what can be built before anything is designed.
- 2Design and structural engineering, with the roofline, siding and window proportions matched to the house.
- 3Foundation, framing and the roof tie-in, made weathertight before any interior work starts.
- 4Heating, cooling, electrical and plumbing extended or upgraded, decided before pricing so nothing is discovered mid-job.
- 5Insulation, drywall, flooring, trim and paint, then a walk-through in daylight before the drop cloths come up.
What we settle before an addition is drawn
Zoning, setbacks and lot coverage are checked before anything is designed, because they decide what can be built at all. The roofline, siding and window proportions are then matched to your house at design, not patched up at the end.
- Heating, cooling and electrical capacity are checked before the price, since a new system and an extended one are different numbers.
- The time for approvals sits on its own line of your timeline from day one, apart from construction.
- The new structure is closed in and weathertight before any interior work starts.