Home Additions Across MD, DC and Northern VA

Additions built on their own foundation and tied into your walls and roof, with setbacks and lot coverage checked before anything is drawn.

Home addition services we offer

Zoning and setbacks come first, then design and engineering, then foundation, framing and roof tie-in, made weathertight before any interior work. A home addition in Maryland, DC or Northern Virginia follows that order, from bump-out additions to a second storey.

  • Room Additions
  • Bump-Outs and Kitchen Extensions
  • Second-Storey Additions
  • Primary Suite Additions
  • Sunrooms and Enclosed Porches
  • Garage and In-Law Additions

Room Additions

A family room, bedroom or office added onto the side or back of the house, on its own foundation.

Bump-Outs and Kitchen Extensions

The kitchen can only work if the wall moves outward by a few feet. A bump-out buys the space without a full addition.

Second-Storey Additions

Building up when the lot will not let you build out. The existing structure is checked for what it can carry before anything is drawn.

Primary Suite Additions

A bedroom and bath added on one level, often for a household that needs a ground-floor suite.

Sunrooms and Enclosed Porches

A conditioned room where a porch or patio is now, built to be used in January as well as June.

Garage and In-Law Additions

An attached garage, or a suite with its own entrance for a parent or an adult child moving home.

What people ask about additions

  • How long does an addition take?

    Months, not weeks, and the approvals before anyone breaks ground take a meaningful share of that. We give you that part of the timeline separately so it is visible from day one.

  • Can my furnace and panel handle the extra space?

    Sometimes. Heating, cooling and electrical capacity are checked before pricing, because a new system is a different number from an extended one.

Addition worries, answered

That it looks bolted on.

It will if the roofline, siding and window proportions are not matched. Those three are decided at design, not at the end.

That halfway through you hear the furnace or the panel cannot carry it.

Heating, cooling and electrical capacity are checked before pricing, because a new system is a different number from an extended one.

That it takes far longer than anyone said.

An addition takes months rather than weeks, and the approvals before anyone breaks ground are a real share of that. We give you that part of the timeline separately, so it is visible from day one.

That the house is open to the weather for weeks.

The foundation, the framing and the roof tie in are made weathertight before any interior work starts.

When to Start an Addition Around DC

Foundation and outside work want ground that is past freezing, and the average last spring freeze in Washington is April 1. Zoning, design and permits take months, so a spring start is planned the fall before. See where remodel time goes.

Addition consultations booked any day

Find out what an addition takes on your lot

  • A free first visit to the house and the lot
  • Approvals and design shown as their own part of the timeline
  • Heating and electrical capacity checked before the price is set

Outgrowing the house? Call:

(240) 695-4415

Home Addition Consultation

We take insurance jobs. Financing may also be available for qualifying projects. Ask when you call.

How an addition gets built

  1. 1Zoning, setbacks and lot coverage are checked first, because they decide what can be built before anything is designed.
  2. 2Design and structural engineering, with the roofline, siding and window proportions matched to the house.
  3. 3Foundation, framing and the roof tie-in, made weathertight before any interior work starts.
  4. 4Heating, cooling, electrical and plumbing extended or upgraded, decided before pricing so nothing is discovered mid-job.
  5. 5Insulation, drywall, flooring, trim and paint, then a walk-through in daylight before the drop cloths come up.

What we settle before an addition is drawn

Zoning, setbacks and lot coverage are checked before anything is designed, because they decide what can be built at all. The roofline, siding and window proportions are then matched to your house at design, not patched up at the end.

  • Heating, cooling and electrical capacity are checked before the price, since a new system and an extended one are different numbers.
  • The time for approvals sits on its own line of your timeline from day one, apart from construction.
  • The new structure is closed in and weathertight before any interior work starts.

Home addition questions

How long does a home addition take?

⌄
Months, not weeks, and the approvals before anyone breaks ground take a meaningful share of that. We give you that part of the timeline separately so it is visible from day one.

Will it look like an addition?

⌄
It will if the roofline, siding and window proportions are not matched. Those three are decided at design, not at the end, and they are the difference between an addition that blends in and an obvious one.

Can my furnace and electrical panel handle the extra space?

⌄
Sometimes. Heating, cooling and electrical capacity are checked before pricing, because a new system is a different number from an extended one.

Is a bump-out cheaper than a full addition?

⌄
Usually, because it can often be carried on the existing structure without a new foundation. Whether yours can is decided on site, not on a drawing.

Do I need a permit for a home addition?

⌄
Yes. An addition is new construction, so it needs a building permit everywhere we work, with zoning checked first and separate permits for the plumbing and electrical inside it. In DC the permit comes from the Department of Buildings, after Historic Preservation Review Board approval if the house is in a historic district. In Montgomery and Prince George's counties it comes from the Department of Permitting Services or DPIE, with WSSC Water for the plumbing. In Fairfax County it is Land Development Services, and Arlington issues it through Permit Arlington. The written scope names who pulls each permit.

Do I need an architect before talking to a remodeler?

⌄
No. You can start with a remodeler, or with both at once. At the first visit we look at the lot, the setbacks and the house, and tell you what the site can take and what the drawings will need to show. An addition does need drawings for the permit, and usually a structural engineer's design for the foundation, beams and roof tie-in, so the drawings come before a firm price.

Can I live in my home while an addition is being built?

⌄
Usually, yes. Most of an addition is built outside the house until it is closed in. The hard part comes when the old exterior wall is opened to join the two, which brings dust and noise and a few days of an opening sealed off with plastic. If the addition takes in the kitchen or the only bathroom, or the roof over the bedrooms comes off for a second story, plan to be somewhere else for that stretch.

What is the first step in planning a home addition?

⌄
Find out what your lot allows. Setbacks, lot coverage, height limits and any HOA or historic rules decide how big the addition can be and where it can go, before anyone draws it. Then decide what the space has to do, which sets its size. Drawings, engineering, the permit and a firm price follow in that order.

What problems come up when tying an addition into an old house?

⌄
Floors and rooflines that do not line up, framing that is out of square, and old wiring or plumbing inside the wall where the opening goes. An older house has settled, so the new floor is set to meet the old one where you walk through, not to a level line. The two roofs have to meet without trapping water. And the heating, the electrical panel and the plumbing have to carry the new space, which is checked before pricing.

Will an addition make my older home look mismatched?

⌄
Only if the roofline, the siding or brick, the trim and the window proportions are not matched to the house, and those are decided at design. On an older house the hardest part is often the material. Faded siding or old brick can be very hard to match, and sometimes a deliberate contrast at the back of the house looks better than a near miss. We hold the samples up against the house before anything is ordered.

What if my lot has setback limits or an HOA?

⌄
Then they set the size and shape before anything is designed. Setbacks fix how close the addition can come to each property line, and lot coverage limits how much of the lot can be built on. On a tight lot, building up instead of out, or a smaller bump-out, can stay inside the limits. An HOA or a historic district adds its own approval, which goes first on the schedule. A variance is possible in some places, but it takes time and is never guaranteed.

Can an addition cause foundation or roof problems on the existing house?

⌄
It can when the tie-in is built wrong. A new foundation settles slightly as it takes the load, so the joint between old and new is detailed to allow for it. Where the roofs meet, the flashing and slope have to carry water away, because a valley that holds water leaks into both buildings. A second story puts new weight on the existing walls and footings, so an engineer checks them first.

How do I check a remodeler's record on addition projects?

⌄
Ask to see additions they have built, with photos, and ask for the permit numbers, since building permits are public record in DC, Maryland and Virginia. Look up the license, get the certificate of insurance, and read the reviews. An addition runs for months, so ask who runs it day to day. Our license number, insurance certificate and reviews are all on this site.

What drawings or plans should I see before signing for an addition?

⌄
A site plan showing the addition and its distance to each property line, floor plans, exterior elevations that show how it meets the house, and the structural design for the foundation, framing and roof. Those are what the permit office reviews. The contract should name which drawings the price is based on, so any later change to the drawings is a change to the price you can see.

My family is growing and we need space this year, how fast can an addition be done?

⌄
An addition takes months, and design, engineering and permits come before construction starts. If the deadline is this year, start now and ask what else gets you a room sooner. Finishing a basement, converting a garage or reworking an existing room can often be done faster, because there is no new foundation or roof. We can price both so you can compare.

A parent is moving in soon, can an in law suite addition be rushed?

⌄
The approvals cannot be rushed, so an addition is rarely ready for a move-in that is close. What can be quick is adapting what you have. A first-floor room becomes the bedroom, a powder room becomes a full bath with a low-threshold shower, and grab bars go in with blocking behind them. A basement suite is another option if there is a door to the outside. The addition can follow if the space is still needed.