Skip to main content
A house mid-renovation with several trades working at once around a new kitchen, cabinets set and the floor still papered
5.0 on Google · 4 reviews

Whole-Home Remodeling Across MD, DC and Northern VA

One project manager runs every trade in order, structure and systems before finishes, so nothing finished gets opened up again.

Whole-home remodeling services we offer

Heating, plumbing, electrical and windows come before kitchens and paint. In the wrong order, finished work gets opened to run a pipe, the costliest mistake on a big project.

  • Whole-Home Renovation
  • Home Additions
  • Garage Conversion
  • In-Law Suites

Whole-Home Renovation

The house needs everything, and doing it a room at a time has started to look like the expensive way.

Home Additions

The house is too small and moving costs more than building.

Garage Conversion

The garage stores things rather than cars, and you need the room more than the storage.

In-Law Suites

Someone is moving in, and the house needs to hold two households without either losing their privacy.

The fears behind a whole house remodel

That you will have to move out for months.

Often you can stay. You hear at the first meeting which stretch of the job will be hardest to live through, usually when the kitchen and a bathroom are out together, so you can plan to be away for just that part. Do you need to move out?

That one late decision holds up everything else.

On a whole house the risk is the order of the work. Heating, plumbing, electrical and windows come before kitchens and paint. You get a schedule for your job with the sequence in it, so ask which decisions it needs from you and by when.

That you cannot tell which numbers are real.

The job is priced by scope, with allowances for selections not yet made. Every allowance is named with a figure, so you can see which numbers are firm and which will move when you choose.

That you will end up chasing the trades yourself.

On a whole house there may be a dozen trades. One project manager books every one of them in the order the house needs, and that person is the only number you need from the first wall opened to the final walk through.

Planning a Whole House Around DC

A whole house has a long fuse. Design and permits take months, so the people who start planning in the fall are the ones building in spring and summer, when remodeling demand peaks. See how a project this size gets a fixed price.

Whole house walkthroughs, seven days

Get a number for the whole house

  • The first walkthrough of the house costs nothing
  • Allowances shown as figures, so you know which lines will move
  • One written price and one schedule for every trade

Big project? Start with a conversation:

(240) 695-4415

Discuss My Whole Home Project

We take insurance jobs. Financing may also be available for qualifying projects. Ask when you call.

One manager, one written order of work

A whole-house remodel runs under one project manager to one written sequence: structure first, then heating, plumbing, electrical and windows, then walls, then finishes. Doing it in the wrong order means opening finished work to run a pipe.

  • Every selection you have not made yet is an allowance with a figure beside it, so the firm numbers and the moving ones are easy to tell apart.
  • Long-lead items such as cabinets and windows are ordered before demolition.
  • You hear at the start which weeks will be hard to live through, so you can decide whether to stay.

Whole home remodel questions

Do we need to move out?

⌄
Some families stay and some do not. It turns on whether the kitchen and the bathrooms are torn out in the same weeks, and how much dust you can put up with. The hardest stretch is marked on the schedule at the start.

How is a project this size priced?

⌄
Line by line from the written scope. Choices you have not made yet, like tile or fixtures, carry an allowance with a figure beside it, so the firm numbers and the ones that can move are easy to tell apart.
Bonded & insured60 to 90 day warranty on our workSince 2020How every project runs →