How much does it cost to remodel a house? Five things set the price

By All Purpose Anytime Services LLC

Five things decide the number, and you control two. What is behind the walls, whether plumbing moves, what you pick, the finish level and permits matter more than square footage.

How much does it cost to remodel a house?

None of the published sources we quote gives a figure for remodeling a whole house, because a house is priced room by room, and we do not publish our own number. The room figures that are published for Washington, DC are a starting point: a kitchen averages $26,865 (Angi) to $35,775 (Fixr), a bathroom $12,651 (Angi) to $19,080 (Fixr), and finishing a basement about $35 to $105 a square foot (Angi).

Add up the rooms you are changing, then add what a whole house brings that single rooms do not: wiring or plumbing that has to be brought up to date through the house, walls coming out, and the weeks you may live elsewhere. The five things below move every one of those lines. Our kitchen, bathroom and basement cost guides take each room in turn.

1. What is behind the walls

This is the one nobody can see from the outside. Older houses in this area regularly turn up knob and tube wiring, galvanised supply lines, undersized joists and plaster over lath.

Two bathrooms that look the same can cost very different amounts once the floor is up. A good estimate says what it assumes is in the wall, and what happens if it is wrong.

2. Whether the plumbing, gas or walls move

Keep the sink, the toilet and the range where they are and you get the cheapest layout available. Move them and floors and walls have to open.

In a basement it can be bigger. A bathroom with the drain below the slab means breaking concrete, which changes both the price and the schedule.

3. What you pick (you control this)

Tile, cabinets, countertops, fixtures and appliances vary enormously in price. Until you choose, they go in the estimate as allowances: a named budget with a figure next to it.

Pick early and those numbers become firm. Pick late and they stay estimates, and a late choice can also hold up the schedule.

4. The finish level (you control this too)

Drywall finish Level 4 is standard for most rooms. Level 5 costs more and is worth it where a wall takes raking light or gloss paint. Two coats of paint on a colour change, not one.

A cheap quote often gets cheap here. Ask what finish level and how many coats the price includes.

5. Permits and review

Most real remodels need a permit. Some addresses add a review first: a historic district in DC, the BAR districts in Alexandria, St. Charles in Waldorf. That is time, and time that is not planned for costs money.

Who pulls the permit belongs in the written scope. If it is not there, ask.

How to get a real number

A walkthrough, a measured scope and a written price with every allowance named. That is what a free estimate from us includes.