How much does a bathroom remodel cost in the DMV?

By All Purpose Anytime Services LLC

Cost sites put the average bathroom remodel in Washington, DC at $19,080 (Fixr) and $12,651 (Angi), and the 2025 Cost vs. Value report puts a midrange bath remodel at $26,138 nationally. Those are market figures, not our price. A bathroom packs the most trades into the smallest room, and six decisions move your number more than its size does.

What published figures say about bathroom costs in the DMV

No source we found published a single figure for the whole DMV, so the DC pages and the national report are what is here. Treat them as a range of what other people paid for other bathrooms.

  • Fixr gives an average bathroom remodel cost in Washington, DC of $19,080 (Fixr).
  • Angi's Washington, DC page lists an average of $12,651 (Angi).
  • The 2025 Cost vs. Value report's national table puts a midrange bath remodel at $26,138, with $20,915 of that recouped in resale value, or 80%, and a universal design bath remodel at $42,183 (Cost vs. Value 2025).

How much does a bathroom remodel cost in the DMV?

There is no single DMV price for a bathroom, because the same room can cost very different amounts in two houses here. What sets it is the house. A 1920s DC row house bathroom on a cast iron stack, a 1960s Prince George's County bathroom on a slab and a 1990s Fairfax bathroom over a plywood subfloor are three different jobs before anyone picks a tile.

The sections below take each decision that moves the price, and the walkthrough turns them into a written number for your room.

Is $10,000 enough to remodel a bathroom?

It depends on which bathroom and what has to change, and we will not give you a yes or a no before we have seen the floor and the stack. What decides it is the list below: whether the fixtures move, tub or shower, how much tile, and what is under the floor. A bathroom that keeps its layout and its sound subfloor is a very different job from one that moves the toilet and finds rot around the tub.

If $10,000 is the number, tell us at the start. The estimate is then written to that budget, with what fits named in writing and what does not fit left out on purpose, not discovered halfway through.

Can I renovate my bathroom for $5000?

On a budget like $5,000 the real question is what to change, since changing everything is off the table. A full gut, with new waterproofing, tile to the studs and new fixtures, is a different scope. A refresh is not: a new vanity and top, a new toilet, new faucet and light, a new exhaust fan vented outside, fresh caulk and paint, with the tub and the tile left where they are if they are sound.

The one thing we would not do on a small budget is tile over a shower that is already leaking. If the floor is soft or the tile is loose, the money goes to the shower first, because that is the part that damages the room below.

What is a realistic budget for a bathroom remodel?

A realistic budget is a written price for your bathroom, with the tile, vanity and fixtures either chosen or carried as named allowances, plus money held back for the subfloor and the drain. Bathrooms are where water has gone for decades, so the floor is the most common surprise. A budget that leaves nothing for it is not realistic in an older house.

Choose the tile and the fixtures before the estimate if you can. Those allowances are the numbers that move, and once they are picked the price is firm.

How much does it cost to remodel a 5x10 bathroom?

A 5x10 bathroom is a common full bathroom: a five foot tub across one end, with the toilet and the vanity along the long wall. We do not publish a price for it, because the size is the one thing that does not decide the price. Two 5x10 bathrooms side by side can come in far apart: one keeps the tub, the layout and a sound floor, the other converts to a walk-in shower, tiles to the ceiling and replaces a cast iron drain.

In a room this size the walls carry most of the tile, so how high the tile goes and what is behind it matter more than the floor area. The sections below take each decision in turn.

What does it cost to remodel a small bathroom?

Less than a large one, though not in proportion to the floor area. A small bathroom still has a toilet, a sink, a tub or shower, a fan and a permit, and those carry most of the cost whatever the size. What a small room saves is tile and some hours.

Keeping the layout matters even more in a small bathroom, because there is rarely room to move one fixture without moving all of them.

Why is a primary bathroom remodel so much more than a guest bathroom?

It usually has more of everything. Two sinks instead of one, a bigger shower with glass, a niche and a bench, sometimes a tub as well, more tile on more walls, and higher grade fixtures for the room you use every day.

A guest bathroom tends to keep a tub with a tiled surround and a single vanity. The trades are the same. The hours and the material are not.

Whether the fixtures move

Keep the toilet, the sink and the tub or shower where they are and the drains and supply lines stay put. The work is demolition, waterproofing, tile and new fixtures in the old places. That is the least expensive bathroom there is.

Move the toilet and a new drain has to run through the joists to the stack, which depends on which way the joists run. Move the shower and the same is true, plus a new pan. In a basement, a drain below the sewer level means an ejector pump. None of this is exotic, but each one is a line the same-layout bathroom does not have.

What is the most expensive part of a bathroom remodel?

Moving the plumbing, when it moves. A toilet or a shower in a new place means new drains through the joists, and sometimes a new vent, before any finish goes in.

When the layout stays, the shower is usually the most expensive part of the room: the pan, the waterproofing, the wall tile and the glass. It is the most labor in the smallest space, and it is the part that cannot be done cheaply without failing later.

Is it worth moving plumbing for a better layout?

It is worth it when the layout is the reason the room does not work, like a door that hits the toilet or a shower too tight to turn around in. It is rarely worth it to gain a few inches.

Moving a toilet means a new drain through the joists to the stack, and on a slab or in a basement it means cutting concrete. Ask for both versions priced, same layout and new layout, and you can see exactly what the move costs.

Tub, shower or both

A drop-in tub with a tiled surround and a tiled walk-in shower with a glass door are different amounts of work. The shower has a pan to build and waterproof, a curb or a curbless slope, more tile, a drain, and glass, which is its own order with its own lead time. A one-piece acrylic unit is less work again, and less to go wrong, but it is a different look.

If you have one bathroom and are weighing a conversion against a full redo, this guide takes you through that decision.

Tile, and how much of it

Tile moves the price twice: what you buy and what it costs to set. Large-format tile sets faster but needs a flatter wall. Small mosaics and patterns take longer. Tile to the ceiling costs more than tile to the top of the surround. A niche, a bench and a decorative band are each a few more hours of layout and cutting.

Until you choose, tile goes in the estimate as a named allowance with a price per square foot and a quantity next to it. Pick early and it becomes a firm number.

Waterproofing: the part you never see again

Behind the tile there is either a proper waterproofing system, pan liner or membrane, flood-tested before tile, or there is not. It is not visible in the finished room and it is the only thing that decides whether the bathroom is still sound in ten years. It is in every one of our bathroom prices. If another quote is lower, ask what is behind the tile.

What is under the floor

Bathrooms are where water has been going for decades. Expect the subfloor around the toilet and the tub to need some replacement, and in older houses expect a cast iron drain that is worth replacing while the floor is open, before the new tile is down. A real estimate says what it assumes about the floor and the stack, and prices the difference as a written change order if it turns out worse.

How much does it cost to rip out and replace a bathroom?

A rip out and replace takes the room back to the studs and the subfloor, hauls it away, and builds it again: any plumbing and electrical changes, new board and waterproofing, tile, vanity, toilet, tub or shower, fan, lights and paint. What it costs is the sum of the decisions on this page, plus whatever the demolition finds. That is why the price is written after the walkthrough, with the floor and the stack checked, not quoted from a photo.

Demolition and haul-away are their own lines in a real estimate. So are the subfloor and the drain if they need replacing. If a quote for a full rip out does not mention them, it is assuming the best case.

Vanity, fixtures, electrical and ventilation

A vanity ranges from a stock cabinet with a top to a custom piece with a stone counter. Faucets, shower valves, toilets and lighting all have stock and designer prices. Every bathroom needs an exhaust fan that vents outside, a GFCI circuit, and often a dedicated circuit for a heated floor or a bidet seat. Those are small lines, but a quote without them is not for the whole room.

What is the cheapest way to get a new bathroom?

Keep the layout. When the toilet, the sink and the tub or shower stay where they are, no drains move and the work is finishes and fixtures in the old places. From there, the cost comes down with each thing you keep: a sound tub can stay, a one-piece acrylic shower or tub unit is less work than a tiled one, and a stock vanity costs less than a custom piece.

If the tub is the problem and the rest of the room is fine, a tub-to-shower conversion changes the room without redoing all of it. The waterproofing and the exhaust fan are not where to save. Those are the parts that keep the new bathroom from becoming the next repair.

How much does a bathroom remodel cost in Fairfax compared to DC?

The house matters more than which side of the river it is on. A DC row house bathroom often sits over the kitchen on an old cast iron stack, with plaster walls and materials carried in from the alley.

A bathroom in a 1970s or 1980s Fairfax split-level usually has newer drains and a plywood subfloor, so fewer surprises turn up once it is open. The same finishes in each tend to price differently because of what is under the floor, not because of the address.

Permits and the real number

A bathroom that moves plumbing or adds electrical needs a permit, from the county or from the Department of Buildings in DC, with the plumbing done by a licensed plumber. Who pulls it is named in the written scope.

Our free estimate includes the walkthrough, a measured scope, every allowance named with a figure and a grade, and the order the work runs in. The general cost guide covers the same levers for any room.

How we price a bathroom

At the walkthrough we check the floor around the toilet and tub and look at the drain, then write the scope item by item, with the waterproofing system on its own line and tile, vanity and fixtures as named allowances if they are still open. The estimate reaches you within 24 to 48 hours of the visit, with a link to approve it.

When the old floor comes up and shows rot or a cracked drain, you see photos before we go on, and the repair is priced in writing first.

Where these numbers come from

Figures are quoted as published. No contractor's price list was used.

  • Fixr, bathroom remodel cost in Washington, DC, checked October 2026: average DC bathroom remodel. fixr.com
  • Angi, bathroom remodel cost in Washington, DC, checked October 2026: average DC bathroom remodel. angi.com
  • Cost vs. Value 2025 (JLC and Zonda), national table: midrange and universal design bath remodels, job cost and resale value. jlconline.com

Want a real number for your bathroom?

We walk the room, check the floor and the stack, and put the price in writing before any tile is bought.

Free Estimate · No Account Needed

Request an Online Estimate

We reply during business hours, 7:00 AM to 7:00 PM every day.

We take insurance jobs. Financing may also be available for qualifying projects. Ask when you call.