
Bathroom Remodeling Contractor in Washington, DC
Most DC row house bathrooms sit over the kitchen on a century-old cast iron stack, so the stack and the joists get checked before we price.
What Bathroom Remodeling Work in Washington Involves
One bathroom, one stack
Most District row houses have one bathroom on the second floor, over the kitchen on a shared cast iron stack that is now a century old and often behind slow drains and odd smells. A full remodel is the time to replace it. A second bathroom ties into that stack or needs a new one, and the joists decide how easy that is.
Waterproofing is the part you never see again
With neighbors on both walls, a leaking shower does not stay your problem. The pan, membrane and flood test happen before tile, and you can see them. Plumbing goes on a Department of Buildings permit with a licensed plumber, and a basement bathroom below sewer level needs an ejector pump, priced from the start.
A DC bathroom remodel is a plumbing decision
In the row houses around Lincoln Park, in Trinidad near Gallaudet University and near the Frederick Douglass National Historic Site, the bathroom sits on wall-to-wall joists beside a century-old stack.
Choose the layout once the pipes and joists are understood. Tile and fixtures are the easy part.
The local concept
The Joist Run
The joist run is the direction the floor joists span under your bathroom, almost always from one party wall to the other in a row house.
A drain that runs along the joists is easy. A drain that has to cross them means notching, sistering or dropping a ceiling below, so the joist run decides where the toilet and shower can go.
What DC homeowners want from their bathroom
Replacing the original bathroom
The single upstairs bath gets stripped to the joists, the cast iron stack replaced, and a new shower waterproofed before tile.
Tub to walk-in shower
Swapping the tub for a walk-in shower is common in narrow bathrooms. The drain moves, so the joist run decides how big the shower can be.
A second bath from a closet or bedroom corner
A closet that backs onto the stack is often the cheapest place for a second bathroom in a row house.
Basement bathrooms
A bath below the sewer line needs an ejector pump. It is planned and priced in the first estimate.
Curbless showers for staying put
A curbless shower with blocking for grab bars lets you stay in the house longer. The floor is recessed so water stays in the shower.
Fans that vent outside
Many older DC bathrooms have no fan, or one that dumps into the attic. A new fan is ducted outside so moisture stops reaching the plaster and the joists.
What a DC bathroom remodel covers
- Cast iron stack replaced while the walls are open
- Drain routes planned around the joist run
- Shower pans, membranes and flood tests before tile
- Ejector pumps for baths below the sewer line
- Curbless showers and grab-bar blocking
- Licensed plumbing under a Department of Buildings permit
Our route to your DC bathroom
Our crew comes from Bryans Road, Maryland, about 17 miles south of the District in a straight line.
They drive up MD 210, take I-295 north along the Anacostia, and use DC 295 to reach Deanwood, Trinidad and the Northeast neighborhoods.
Areas Served Around Washington
Washington Remodeling Questions
Can you add a second bathroom to a DC row house?
⌄
Do I need a permit for a bathroom remodel in DC?
⌄
Should I replace the cast iron stack during my bathroom remodel?
⌄
Can my DC bathroom have a curbless shower?
⌄
Do you work in Trinidad, Deanwood and Anacostia?
⌄
Does my DC bathroom need an exhaust fan?
⌄
Can a clawfoot tub go back in after the remodel?
⌄
Start My Estimate in Washington
Fill out the form below or call (240) 695-4415 to talk it through. We answer every day, 7:00 AM to 7:00 PM.
We take insurance jobs. Financing may also be available for qualifying projects. Ask when you call.